Client: BioMedical Research Company Location: London LoadBank Model: 1100kw Resistive LoadBank LoadBank Tests: 2 x Permanent Generators Project Overview: Four Engineers carried out the regular yearly loadbank tests for the buildings back-up generator power. This was undertaken to check that the site’s back-up power would perform to the required standards should a mains power outage occur. Our Engineers delivered and